Young , N. and Murillo Godoy , V. (2024) “Environmental monitoring of the project study, design, construction and financing for the interconnection of Cinta Costera 3-Amador Causeholder”, Centros: Revista Científica Universitaria, 13(2), pp. 52–73. doi: 10.48204/j.centros.v13n2.a5288.